On July 11, 2017, at 09:30 a.m., the company carried out a comprehensive rescue and training exercise for the production safety accident emergency rescue in the vacant area between the two plant area, the 204 workshop and the -205 workshop. The whole drill is divided into: accident alarm, workshop response and factory
Level response, three stages. This exercise lasted 1 hours, including 204 participants in the workshop staff, 205 employees, R & D Building Technology Department, R & D building QC, two factory, two factory QA Engineering Department, production department, two factory two factory integrated factory security department and two a total of more than 130 people.
Each participant should first stand on standby and simulate the daily working condition.
At 9:30 a.m., EHS director Wang Zichen issued a drill order to the 204 drill crew, and drills began. The development of smoke pot simulation of bromine leakage fainted at the scene, accompanied by the immediate evacuation of Liejun and pan peace to the 204 week workshop director report;
9:35, Zhou Liejun rushed to the scene in the office after receiving the call, on-site command Tang Chengwen and Zhou Zhiyuan wearing chemical suits called empty scene, ask Yang Hua to inform and assist the evacuation of 205 workshop, a notice of the comprehensive department make bright hole and organizing the evacuation workshop.
9:37, Wang Yijun, Li Wenhao and Dong Xuetao received a phone call after Tang Chengwen get away, Zhou Zhiyuan carried the wounded to the door, 205 workshop director Weng Xianjun after receiving the call to monitor the workshop to evacuate, with Luo Shuli, Wang Xiaoqiang, Wu Rang, Hu Bing lob fire water and liquid ammonia complement consumption. 204, 205 workshop staff according to the simulated wind direction, northeast wind direction, logistics corridor, emergency collection point evacuation.
At the same time, two factory director Zhang Xiaohua received the phone, to the guard to see the scene video, let the doorman notify Wang Liangming, Ou Yan, Tang Haiyan to the scene collection.
9:42 director, arrived at the scene, 204 workshop director, workshop director, Department of Wang Yijun 205 comprehensive report to the director, the director orders at the scene the emergency group, on-site warning alert group, group to rescue supplies, office of Shu
And the project rescue team to enter the accident scene, engineering emergency repair leakage gasket.
9:49 plant material support group to transport supplies to the scene, Ou Yan reported to Zhang Xiaohua to complete the task; plant engineering rescue team smooth valve gasket replacement, bromine leakage source control; power plant engineering rescue team to the headquarters to withdraw
The Zhou Liejun report task; Zhou Liejun ordered to withdraw Luo Shuli, Wang Xiaoqiang, ordered the plant engineering rescue group on standby 2 people use 400kg on the site of the cylinder bromine gas trap; trapping of the Zhang Xiaohua report after the completion of the task; Zhang Xiaohua ordered 204 workshop on-site rescue group on the scene of the early use of liquid alkali decontamination.
9:52, Zhang Xiaohua instructed the plant environmental monitoring group wearing full cover admission to the wastewater sampling of atmospheric detection, were collected for hazardous waste disposal of gaskets replaced; on the tank near the gas after passing the Zhang Xiaohua report.
Zhang Xiaohua announced the end of the emergency drill, the scene thoroughly washed away. Collect on-site training personnel and make relevant comments.
This exercise through emergency drills, to enhance the drill organization personnel, personnel involved in the emergency plan familiarity, improve its emergency response capability. And find out the existing problems in the emergency plan, and improve the practicability and operability of the emergency plan.
In general, this exercise is carried out in accordance with the training program, including personnel evacuation, personnel rescue and project rescue. However, there are still some problems, please check the attachment at the bottom of the article.
Drill live

Open the smoke can
 
Workshop director on-site view
 
Prepare for rescue
 
Scene rescue carried out


General department stretcher support
 
The scene disaster control team uses small liquid ammonia cylinder to control the disaster situation
 
The scene of the disaster control group with fire lob
 
 
Office regional evacuation team
 
 
 
Plant materials volunteer group shipped 400kg bottle of liquid ammonia
 
 
 
 
The director received a telephone call to the scene
 
 
 
 
Project rescue team rushed to the scene

Environmental monitoring group inspection

 

Review after walkthrough